|
|
| Construction Fee Schedule |
Building Fee Schedule #1
|
New Building |
$0.0270/cu ft |
|
Addition |
$0.0270/cu ft |
|
Alteration - First $999,999 |
$24/$1000 |
|
Alteration - next $999,999 |
$24/$1000 |
|
Alteration - balance |
$24/$1000 |
|
|
|
| XA-2 XI-2 |
Roofing R3/R4 |
$45 flat |
| XA-3 XI-3 |
Siding R3/R4 |
$45 flat |
| XA-4 XI-4 |
Fence |
$45 flat |
| XA-5 XM |
Sign |
$1.20 sq/ft |
| XB XR-1 |
Pool |
$100 flat |
| XE R-2 |
Asbestos Abate |
$0 flat |
| XF-1 R-3 |
Lead Hazard |
$140 flat |
| XF-2 R-4 |
Demolition |
$65 flat |
| XH-1 R-5 |
|
|
| XH-2 XS-1 |
|
|
|
CO |
$30 flat |
|
CO (Asbestos) |
$30 flat |
|
CCO |
$120 flat |
|
CCL |
$0 flat |
|
User Group Change |
$120 flat |
|
Minimum Fee |
$45 |
|
Maximum Fee |
|
|
Administrative SC |
0% |
|
Plan Review Credit |
5% | Building Fee Schedule #2
|
New Building |
$0.0270/cu ft |
|
Addition |
$0.0270/cu ft |
|
Alteration - First $999,999 |
$24/$1000 |
|
Alteration - next $999,999 |
$24/$1000 |
|
Alteration - balance |
$24/$1000 |
|
|
|
| A-2 I-2 |
Roofing R3/R4 |
$45 flat |
| A-3 I-3 |
Siding R3/R4 |
$45 flat |
| A-4 I-4 |
Fence |
$45 flat |
| A-5 M |
Sign |
$1.20 sq/ft |
| B R-1 |
Pool |
$100 flat |
| E XR-2 |
Asbestos Abate |
$140 flat |
| F-1 XR-3 |
Lead Hazard |
$140 flat |
| F-2 XR-4 |
Demolition |
$65 flat |
| H-1 XR-5 |
|
|
| H-2 S-1 |
|
|
|
CO |
$30 flat |
|
CO (Asbestos) |
$30 flat |
|
CCO |
$120 flat |
|
CCL |
$0 flat |
|
User Group Change |
$120 flat |
|
Minimum Fee |
$45 |
|
Maximum Fee |
|
|
Administrative SC |
0% |
|
Plan Review Credit |
5% | Building Fee Schedule #3
|
New Building |
$0.0090/cu ft |
|
Addition |
$0.0090/cu ft |
|
Alteration - First $999,999 |
$12/$1000 |
|
Alteration - next $999,999 |
$12/$1000 |
|
Alteration - balance |
$12/$1000 |
|
|
|
| A-2 I-2 |
Roofing R3/R4 |
$0 flat |
| A-3 I-3 |
Siding R3/R4 |
$0 flat |
| A-4 I-4 |
Fence |
$0 flat |
| A-5 M |
Sign |
$1.00 sq/ft |
| B R-1 |
Pool |
$100 flat |
| E R-2 |
Asbestos Abate |
$0 flat |
| F-1 R-3 |
Lead Hazard |
$0 flat |
| F-2 R-4 |
Demolition |
$65 flat |
| H-1 R-5 |
|
|
| H-2 S-1 |
|
|
|
CO |
$0 flat |
|
CO (Asbestos) |
$25 flat |
|
CCO |
$25 flat |
|
CCL |
$0 flat |
|
User Group Change |
$25 flat |
|
Minimum Fee |
$40 |
|
Maximum Fee |
|
|
Administrative SC |
0% |
|
Plan Review Credit |
20% | Plumbing Fees:
| Water Closet: $20 |
Steam Boiler: $75 |
| Urinal/Bidet: $20 |
Hot Water Boiler: $75 |
| Bath Tub: $20 |
Sewer Pump: $75 |
| Lavatory: $20 |
Interceptor/Sep'r: $75 |
| Shower: $20 |
Backflow Preventer: $20 |
| Floor Drain: $20 |
Greasetrap: $75 |
| Sink: $20 |
Sewer Connection: $75 |
| Dishwasher: $20 |
Water Service Conn: $75 |
| Drinking Fountain: $20 |
Stacks: $20 |
| Washing Machine: $20 |
|
| Hose Bibb: $20 |
Minimum Fee: $45 |
| Water Heater: $75 |
Maximum Fee: |
| Fuel Oil Piping: $75 |
Administrative SC: 0% |
| Gas Piping: $75 |
| Electrical Fees:
| Receptacles & Fixtures |
First 50 |
$40 |
| |
each additional 25 |
$12 |
|
|
|
| Motors & Electrical Devices |
over 1 hp, up to 10 hp |
$12 |
|
up to 50 hp |
$53 |
|
up to 100 hp |
$106 |
|
larger than above |
$526 |
|
|
|
| Transformers & Generators |
over 1 kw, up to 10.0kw |
$12 |
|
up to 50.0kw |
$53 |
|
up to 100.0kw |
$106 |
|
larger than above |
$526 |
|
|
|
| Service Panels, Entrances & Subpanels |
up to 200 amps |
$53 |
|
up to 800 amps |
$106 |
|
larger than above |
$526 |
|
|
|
| Minimum Fee: $45 |
|
|
| Maximum Fee |
|
|
| Administrative Surcharge: 0% |
|
|
Fire Protection Fees:
| Storage Tanks |
Pre-Engineered Systems |
$45 |
| |
Wet Chemical |
$92 |
|
Dry Chemical |
$92 |
|
|
|
| Alarm/Supervisory/Signaling |
first 12 |
$45 |
|
each additional 4 |
$4 |
|
|
|
| Suppressions |
CO2 |
$92 |
|
Foam |
$92 |
|
Halon |
$92 |
|
|
|
| Wet & Dry Sprinkler Heads |
|
|
|
1-12 |
$45 |
|
13-40 |
$65 |
|
41-100 |
$120 |
|
101-200 |
$229 |
|
201-400 |
$594 |
|
over 400 |
$822 |
|
|
|
| Kitchen Hood Exhaust System |
|
$45 |
| Smoke Control Systems |
|
0 |
| Gas or Oil Fired Appliance |
|
$45 |
| Stand Pipes |
|
$229 |
|
|
|
| Minimum Fee: $45 |
|
|
| Maximum Fee |
|
|
| Administrative Surcharge: 0% | | |
|
Home -
Contact - Site Map
Copyright © 2006 City of Lambertville All Rights
Reserved. |
|
| | Sun | Mon | Tue | Wed | Thu | Fri | Sat |
|---|
| | | | | | 1 | | 2 | 3 | 4 | 5 | 6 | 7 | 8 | | 9 | 10 | 11 | 12 | 13 | 14 | 15 | | 16 | 17 | 18 | 19 | 20 | 21 | 22 | | 23 | 24 | 25 | 26 | 27 | 28 | 29 | | 30 | | | | | | |
|
|